Armitage Centre Studio Refurbishment 

Armitage Centre Studio Refurbishment 

Value - £250k 
Duration - 10 weeks 

The scope of works involved the full refurbishment of existing G.008 Studio space. Minor structural works were required for the removal of existing corridor walls to enlarge space & installation of new steel work and temporary propping works. 
 

Works included  

  • New wall finishes, Ceiling rafts, 
  • Flooring finishes, 
  • Doors 
  • AV media system 
  • Upgrades to electrical infrastructure 